Interactive Project Map

Interactive Project Map

To show how the new Section 1 transmission line may look after it is built, Central Maine Power (CMP) is providing visual renderings of the planned work.

The interactive map below includes 16 sets of these renderings showing Section 1 prior to construction and what we anticipate it will look like once completed.

To use: Select the location. Use the slider to move between "before" and "after" images, or select regular or panoramic printable PDFs on the bottom of each page. 


Please note: The vegetation (plants and trees) included in the "new" images is approximate and may be adjusted in the field based on actual conditions and forestry standards. Low-level vegetation will be cleared before construction (not shown in images). The area will be restored with seeded straw.

Get in touch

For more information about CMP’s Section 1 Transmission Line Rebuild, please contact Project Outreach

T: 888-267-0821
E: [email protected]

Ask a question?

Name is a required field
Email is a required field
Street Address is a required field
Question is a required field